Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following Work: The Work for this Contract includes, but is not limited to, the installation of approx. 5,000 LF of 8" water line, 6,100 LF of 12-inch water line, 2,100 LF of 16-inch water line, 2,100 LF of 8-inch drain line, and 2,100 LF of 3-inch conduit; four separate trenchless bores; approximately 450 LF of 8-inch diameter high density polyethylene water line inside a 16-inch diameter casing on the Interstate 84 overpass; two overhead canal crossings; approximately 4,000 LF of 14-foot wide gravel access road improvements; together with all other Work required to complete the Project as shown in the Contract Documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableConstruction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
AvailableThis project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis