Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of site improvements, tank modification and improvements, scada, waterlines, and necessary appurtenances. Furnish and install tank water mixer on 26,000 gallon ground storage tank including, but not limited to, all electrical, wiring, breakers, mounts, and tank modifications; remove and replace roof vent with 8" diameter vent with vinyl fine screen meshing on 26,000 gallon ground storage tank; furnish and install new osha approved exterior water access ladder with lockable gate on 26,000 gallon ground storage tank. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1 LS furnish, install, implement, and maintain temporary erosion and sediment control during construction, and all related work; 1 LS perform all demolition and removal of existing improvements designated for removal; 1 LS furnish and install pump station including foundation, metal building, skid mounted pumping system, piping, valves, flow meters; 1 LS furnish and install 3,000 gallon hydro-pneumatic tank including foundation, coating, testing and disinfection, air compressor, sight glass, level switches, pressure switches, ancillary piping, and all other items required. See attached file.
Posted Date
Jan 8, 2026
Due Date
Feb 17, 2026
Release: Jan 8, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS furnish, install, implement, and maintain temporary erosion and sediment control during construction, and all related work; 1 LS perform all demolition and removal of existing improvements designated for removal; 1 LS furnish and install pump station including foundation, metal building, skid mounted pumping system, piping, valves, flow meters; 1 LS furnish and install 3,000 gallon hydro-pneumatic tank including foundation, coating, testing and disinfection, air compressor, sight glass, level switches, pressure switches, ancillary piping, and all other items required. See attached file.
AvailableProject consists of water system improvement. Work includes no.11 water distribution improvements; no.12 well improvements; no.13 sanitary sewer improvements.
Posted Date
-
Due Date
Feb 24, 2026
Close: Feb 24, 2026
Project consists of water system improvement. Work includes no.11 water distribution improvements; no.12 well improvements; no.13 sanitary sewer improvements.
AvailableThe project includes but is not limited to replacement of pumps, actuators, valves, filter media, recoating of clarifiers, HVAC work, and additional high priority water treatment plant items as well as water distribution improvements including but not limited to hydrant assemblies and valve replacements. The work includes all appurtenances, restoration, testing and all other work required for the completion of the project.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The project includes but is not limited to replacement of pumps, actuators, valves, filter media, recoating of clarifiers, HVAC work, and additional high priority water treatment plant items as well as water distribution improvements including but not limited to hydrant assemblies and valve replacements. The work includes all appurtenances, restoration, testing and all other work required for the completion of the project.
AvailableWater distribution improvements project.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Water distribution improvements project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →