Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of the site work associated with the construction of a prefabricated water treatment building, and startup and testing assistance, as required to incorporate a new bedrock water supply well SD2-1 at the Town of North Castle Water District No. 4 property. The site work will include all the necessary excavation and backfill, concrete work, mechanical, electrical, plumbing and water supply well work, and all appurtenant work, to make the prefabricated water treatment building operational. The furnishing of the water treatment building will be provided under a separate contract with the Town of North Castle. The site work contractor will be required to coordinate with the manufacturer of the prefabricated treatment building to deliver, offload and secure the prefabricated treatment building upon the concrete foundation. The site work contractor will be required to make the final plumbing and electrical connections to the prefabricated water treatment building to make the water supply and treatment system for Well SD2-1 operational.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
Release: Dec 23, 2025
Close: Jan 21, 2026
Project includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
AvailableWork includes construction of the remote well no. 1 and water supply plant no. 1 - phase 4.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Work includes construction of the remote well no. 1 and water supply plant no. 1 - phase 4.
AvailableProject consists of replacing the existing main filter plant including ground storage reservoirs and booster pump station with water treatment plant 1 located at a new site. The project consists of turning well 9 site into water treatment plant 2. The project consists of work at the main filter plant site, water treatment plant 1 site, water treatment plant 2 site, well 4 site, well 5 site, well 8 site, well 9 site, and well 10 site. The work at the main filter plant site includes demolishing two ground storage reservoirs, main booster pump station, maintenance shop, and well 4 building.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
Project consists of replacing the existing main filter plant including ground storage reservoirs and booster pump station with water treatment plant 1 located at a new site. The project consists of turning well 9 site into water treatment plant 2. The project consists of work at the main filter plant site, water treatment plant 1 site, water treatment plant 2 site, well 4 site, well 5 site, well 8 site, well 9 site, and well 10 site. The work at the main filter plant site includes demolishing two ground storage reservoirs, main booster pump station, maintenance shop, and well 4 building.
Construction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Construction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.