Charter Township of Plainfield
The project consists of furnishing all material and constructing the following: 5,400 LF of 12" water main including fittings, hydrants, valves, and water services. Bore & Jack of 130 LF of 24" x 0.375" W.T. steel casing.
01 Advertisement 2025-10 West River Dr-1
City of Muskegon Heights
Water supply system improvements.
City of Royston
Water system improvements including the installation of approx. 2,900 LF of 12" C–900 PVC water line and appurtenances within the existing right–of–way, connecting to the exiting 10" ductile iron water line.
City of Tescott
Provide water supply system improvements - phase 1. Work includes furnishing all the materials, and equipment for construction of a split faced block building; excavation; backfilling; grading; site and building concrete work; architectural work; masonry block construction; process piping; mechanical and electrical equipment; electrical power upgrades; valves, meters, hydrants, & appurtenances; liquid chlorine equipment; submersible well pumps; well pitless units; water well inspections and improvements at both wells; backup generator; piping; installation of 3" & 4" PVC piping; gravel surfacing; grass seeding; erosion control; well piping and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Release
Oct 29, 2025
Close
Nov 25, 2025