Summary
Provide water supply and wastewater system improvements. The project consists of furnishing all material and constructing the following: 6,100 LF (approx.) of 16" ductile iron water main; 1,400 LF (approx.) of 8" ductile iron water main; 2,500 LF (approx.) of 12" (O.D.) DR11 HDPE sanitary force main (open cut installation); 540 LF of 12" (O.D.) DR11 HDPE sanitary force main (slip line installation); 700 LF (approx.) of 12" (O.D.) DR11 HDPE sanitary force main (horizontal directional drill); 220 LF of bore & jack - 30" casing (I-196 BL); 15,000 LF (approx.) of water main and force main abandonment; 4,800 Tons (approx.) of HMA pavement (driveways, pathways, roads, parking lots); 910 SF of concrete curb removal/replacement; Maintenance of Traffic; Sanitary sewer flow bypass pumping and pump and haul operations; Pump Station No. 20 retrofit; Water main crossing under Noordeloos Creek; Tree and brush removal; Incidental cross culvert and storm sewer replacement; Turf and landscaping restoration.