Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Augusta
Work includes 95 SY of structural concrete, stamped colored concrete pavement; 190 LF of 8" sdr-35 pvc storm drain; 35 VLF of catch basin type a1-c; 7 VLF of catch basin type b1-c; adjust manhole or cb to grade; 660 SY of plain concrete sidewalk; 170 SF of curb ramp detectable warning field; replace 25 SY of concrete sidewalk; 750 SY of constructing sidewalk; regrading 120 SY of sidewalk; 360 LF of vert curb type 1; 180 LF of 4" white or yellow painted pavement marking line; removing 170 SF of pavement markings. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Augusta
The work consists of the following: pedestrian safety improvements along water street with curb, drainage, and sidewalk improvements.
Posted Date
Nov 6, 2025
Due Date
Dec 5, 2025
Release: Nov 6, 2025
City of Augusta
Close: Dec 5, 2025
The work consists of the following: pedestrian safety improvements along water street with curb, drainage, and sidewalk improvements.
AvailableTownship of Harrison
Street pedestrian safety improvements.
Posted Date
Nov 14, 2025
Due Date
Nov 25, 2025
Release: Nov 14, 2025
Township of Harrison
Close: Nov 25, 2025
Street pedestrian safety improvements.
AvailableCity of Memphis
Elementary Pedestrian Safety Improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 3, 2025
Release: Nov 7, 2025
City of Memphis
Close: Dec 3, 2025
Elementary Pedestrian Safety Improvements.
AvailableCity of Long Beach
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Long Beach
Close: Dec 18, 2025
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
Available