Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Memphis
Elementary Pedestrian Safety Improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Augusta
The work consists of the following: pedestrian safety improvements along water street with curb, drainage, and sidewalk improvements.
Posted Date
Nov 6, 2025
Due Date
Dec 5, 2025
Release: Nov 6, 2025
City of Augusta
Close: Dec 5, 2025
The work consists of the following: pedestrian safety improvements along water street with curb, drainage, and sidewalk improvements.
AvailableTownship of Harrison
Street pedestrian safety improvements.
Posted Date
Nov 14, 2025
Due Date
Nov 25, 2025
Release: Nov 14, 2025
Township of Harrison
Close: Nov 25, 2025
Street pedestrian safety improvements.
AvailableTownship of West Windsor
Quantities include but are not limited to approx 4 UNITS Rectangular Rapid Flashing Beacons, 12 Units Warning Signs, 12 UNITS Warning Plaques, and other incidental construction including restoration.
Posted Date
Sep 23, 2025
Due Date
Dec 3, 2025
Release: Sep 23, 2025
Township of West Windsor
Close: Dec 3, 2025
Quantities include but are not limited to approx 4 UNITS Rectangular Rapid Flashing Beacons, 12 Units Warning Signs, 12 UNITS Warning Plaques, and other incidental construction including restoration.
AvailableTown of Southbury
Work includes 20 CY earth excavation; 2 CY rock excavation; 1 LS management of reusable and surplus soil; 50 SY removal of concrete sidewalk; 170 LF cut bituminous concrete pavement; 30 SY removal of bituminous sidewalk; 35 CY borrow; 8 ea sediment control system at catch basin; 580 LF sedimentation control system; 50 SY pavement repair; 40 LF concrete curbing; 80 LF bituminous concrete lip curbing; 3,500 SF concrete sidewalk; 2,000 SF concrete sidewalk ramp; 250 SF detectable warning surface. See attached file.
Posted Date
Oct 16, 2025
Due Date
Nov 19, 2025
Release: Oct 16, 2025
Town of Southbury
Close: Nov 19, 2025
Work includes 20 CY earth excavation; 2 CY rock excavation; 1 LS management of reusable and surplus soil; 50 SY removal of concrete sidewalk; 170 LF cut bituminous concrete pavement; 30 SY removal of bituminous sidewalk; 35 CY borrow; 8 ea sediment control system at catch basin; 580 LF sedimentation control system; 50 SY pavement repair; 40 LF concrete curbing; 80 LF bituminous concrete lip curbing; 3,500 SF concrete sidewalk; 2,000 SF concrete sidewalk ramp; 250 SF detectable warning surface. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis