Pasadena Water and Power
The City of Pasadena Water Department seeks a contractor to furnish all labor, equipment, vehicles, and facilities to perform water main line stopping services for Pasadena Water and Power. Bids are submitted electronically via the City’s OpenGov eProcurement portal and are due by the stated deadline.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Falls City
Replacing and installing new 6" PVC main line. The existing water services along these new lines will be connected to the new main line. The existing fire hydrants will be connected to the new main line as well. approx. 153 LF 12" steel casing;
Posted Date
Nov 14, 2025
Due Date
Dec 2, 2025
Release: Nov 14, 2025
City of Falls City
Close: Dec 2, 2025
Replacing and installing new 6" PVC main line. The existing water services along these new lines will be connected to the new main line. The existing fire hydrants will be connected to the new main line as well. approx. 153 LF 12" steel casing;
AvailableSCRO
Tapping into the existing 12" DI water main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6" supply and a return on the 12" water main underground, penetrating through the metal building wall, and install a 6" line to the existing water softener system.
Posted Date
Jul 25, 2025
Due Date
Nov 25, 2025
Release: Jul 25, 2025
SCRO
Close: Nov 25, 2025
Tapping into the existing 12" DI water main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6" supply and a return on the 12" water main underground, penetrating through the metal building wall, and install a 6" line to the existing water softener system.
AvailableTown of Cameron
This project will include a connection to the Town of Cameron water main distribution system. The base bid will include 5,278 LF of water main piping with five additional alternatives, each measuring 500 LF of water main piping. The proposed work will extend fire services to additional customers.
Posted Date
Nov 13, 2025
Due Date
Dec 9, 2025
Release: Nov 13, 2025
Town of Cameron
Close: Dec 9, 2025
This project will include a connection to the Town of Cameron water main distribution system. The base bid will include 5,278 LF of water main piping with five additional alternatives, each measuring 500 LF of water main piping. The proposed work will extend fire services to additional customers.
AvailableSouth Carolina Public Service Authority
The Cameron Water Main Connection solicitation requests construction work to connect to the Town of Cameron water main distribution system, including 5,278 linear feet of water main piping plus five 500 LF alternatives to extend fire services within Calhoun County. The project is Design-Bid-Build with an estimated construction cost range of $2.4 million to $3.1 million.
Posted Date
Nov 13, 2025
Due Date
Dec 9, 2025
Release: Nov 13, 2025
South Carolina Public Service Authority
Close: Dec 9, 2025
The Cameron Water Main Connection solicitation requests construction work to connect to the Town of Cameron water main distribution system, including 5,278 linear feet of water main piping plus five 500 LF alternatives to extend fire services within Calhoun County. The project is Design-Bid-Build with an estimated construction cost range of $2.4 million to $3.1 million.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis