Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Cameron
This project will include a connection to the Town of Cameron water main distribution system. The base bid will include 5,278 LF of water main piping with five additional alternatives, each measuring 500 LF of water main piping. The proposed work will extend fire services to additional customers.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Gilbert-Summit Rural Community Water District
6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
Posted Date
Oct 27, 2025
Due Date
Nov 27, 2025
Release: Oct 27, 2025
Gilbert-Summit Rural Community Water District
Close: Nov 27, 2025
6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
AvailableCity of Crescent City
Construction of approximately 1,400 LF of 6" PVC DR 18 water main, fire hydrant assemblies, and connection to existing mains.
Posted Date
-
Due Date
Dec 4, 2025
City of Crescent City
Close: Dec 4, 2025
Construction of approximately 1,400 LF of 6" PVC DR 18 water main, fire hydrant assemblies, and connection to existing mains.
AvailableCity of Crescent City
Construction of approximately 1,650 LF of 12" PVC DR 18 water main, 1,550 LF of 8" PVC DR 18 water main, 60 LF of 6" PVC DR 18 water main, 50 LF of 4" PVC DR 18 water main, fire hydrant assembly, and connection to existisng mains. The project includes alternates to extend 4β and 12β water mains, as well as alternate installation methods using directional drilling of fusible PVC material.
Posted Date
-
Due Date
Dec 4, 2025
City of Crescent City
Close: Dec 4, 2025
Construction of approximately 1,650 LF of 12" PVC DR 18 water main, 1,550 LF of 8" PVC DR 18 water main, 60 LF of 6" PVC DR 18 water main, 50 LF of 4" PVC DR 18 water main, fire hydrant assembly, and connection to existisng mains. The project includes alternates to extend 4β and 12β water mains, as well as alternate installation methods using directional drilling of fusible PVC material.
AvailableTown of Jones
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
Posted Date
-
Due Date
Nov 20, 2025
Release: -
Town of Jones
Close: Nov 20, 2025
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis