Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Crescent City
Construction of approximately 1,650 LF of 12" PVC DR 18 water main, 1,550 LF of 8" PVC DR 18 water main, 60 LF of 6" PVC DR 18 water main, 50 LF of 4" PVC DR 18 water main, fire hydrant assembly, and connection to existisng mains. The project includes alternates to extend 4” and 12” water mains, as well as alternate installation methods using directional drilling of fusible PVC material.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Crescent City
Construction of approximately 1,400 LF of 6" PVC DR 18 water main, fire hydrant assemblies, and connection to existing mains.
Posted Date
-
Due Date
Dec 4, 2025
City of Crescent City
Close: Dec 4, 2025
Construction of approximately 1,400 LF of 6" PVC DR 18 water main, fire hydrant assemblies, and connection to existing mains.
AvailableCity of North Chicago
The City of North Chicago is soliciting sealed bids for Water Tower No. 1 and Transmission Main, Contract B, which includes installation of 6‑inch to 24‑inch ductile iron water main by open cut and horizontal directional drilling with associated appurtenances and restoration. Sealed bids are due at City Hall by 2:00 PM on January 9, 2026, with a mandatory pre‑bid conference on December 17, 2025.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
City of North Chicago
Close: Jan 9, 2026
The City of North Chicago is soliciting sealed bids for Water Tower No. 1 and Transmission Main, Contract B, which includes installation of 6‑inch to 24‑inch ductile iron water main by open cut and horizontal directional drilling with associated appurtenances and restoration. Sealed bids are due at City Hall by 2:00 PM on January 9, 2026, with a mandatory pre‑bid conference on December 17, 2025.
AvailableCity of Naperville
Water main improvements.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
City of Naperville
Close: Dec 12, 2025
Water main improvements.
AvailableVillage of Creston
Work includes water main reconnections as well as hydrant and valve replacements throughout the village. Improvements include 4" water main abandonment, water service line reconnections, hydrant replacements, valve replacements, pavement restoration and site restoration.
Posted Date
Nov 7, 2025
Due Date
Nov 21, 2025
Release: Nov 7, 2025
Village of Creston
Close: Nov 21, 2025
Work includes water main reconnections as well as hydrant and valve replacements throughout the village. Improvements include 4" water main abandonment, water service line reconnections, hydrant replacements, valve replacements, pavement restoration and site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis