Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove (2) existing Rheem 91-gallon natural gas water heaters model number G91-200-1 at RecPlex East and replace with (2) natural gas Rinnai Demand Duo H-Series, Condensing Hybrid Indoor Commercial Water Heaters, Model CHS199100HCXiN or equivalent. In addition to this primary scope, quotes should include an assessment of the entire scope of repairs required for complete installation of the new unit to meet current code requirements. This includes expected repairs to existing exterior vent louvers, providing new domestic cold and hot water supply piping with insulation, natural gas piping and any additional scope identified as required for safe and effective replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Commercial water heater replacement.
Posted Date
Dec 18, 2025
Due Date
Feb 13, 2026
Release: Dec 18, 2025
Close: Feb 13, 2026
Commercial water heater replacement.
AvailableRelease: Jan 16, 2026
Close: Feb 19, 2026
Water heater replacement.
AvailableThe vendor shall provide the steam hot water heater and all required installation appurtenances meeting the following specifications: The semi-instantaneous water heater shall be steam heated. Input and output are 2-1/2”. Steam pressure is reduced from 70psi to 27psi by way of a 2” pressure reducer. The water heater shall be capable of heating 45 GPM water from 40° to 140̈°. Vendor shall provide an electric valve. Electric Valve shall interface (read only, not control) with the VA’s Building Management System (BMS). Proposed water heater shall be provided with all fittings and accoutrements for a “Plug and Play” switch out with the existing fit-up.
Posted Date
Jan 8, 2026
Due Date
Jan 20, 2026
Release: Jan 8, 2026
Close: Jan 20, 2026
The vendor shall provide the steam hot water heater and all required installation appurtenances meeting the following specifications: The semi-instantaneous water heater shall be steam heated. Input and output are 2-1/2”. Steam pressure is reduced from 70psi to 27psi by way of a 2” pressure reducer. The water heater shall be capable of heating 45 GPM water from 40° to 140̈°. Vendor shall provide an electric valve. Electric Valve shall interface (read only, not control) with the VA’s Building Management System (BMS). Proposed water heater shall be provided with all fittings and accoutrements for a “Plug and Play” switch out with the existing fit-up.
The White River Junction VA Medical Center (Department of Veterans Affairs) seeks a qualified vendor to provide and install a replacement semi-instantaneous steam-heated water heater capable of heating 45 GPM from 40°F to 140°F; the work includes providing an electric valve that interfaces with the VA Building Management System and all fittings for a plug-and-play swap. The procurement is issued as a Request for Quotation (RFQ) and is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB); quotes will be evaluated under Simplified Acquisition Procedures. A mandatory site visit is scheduled for January 15, 2026 at 10:00 AM and quotes are due January 19, 2026 at 5:00 PM EST.
Posted Date
Jan 8, 2026
Due Date
Jan 19, 2026
Release: Jan 8, 2026
Close: Jan 19, 2026
The White River Junction VA Medical Center (Department of Veterans Affairs) seeks a qualified vendor to provide and install a replacement semi-instantaneous steam-heated water heater capable of heating 45 GPM from 40°F to 140°F; the work includes providing an electric valve that interfaces with the VA Building Management System and all fittings for a plug-and-play swap. The procurement is issued as a Request for Quotation (RFQ) and is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB); quotes will be evaluated under Simplified Acquisition Procedures. A mandatory site visit is scheduled for January 15, 2026 at 10:00 AM and quotes are due January 19, 2026 at 5:00 PM EST.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis