Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Housing Authority of Lawrence County is seeking bids for the replacement of water heaters at Development 86-001 & 002 in Louisa, Kentucky. Bidders must comply with various federal regulations, including the Toxic Substances Control Act, and provide certification as a 'Certified Renovator.' A prebid conference and walk-through are scheduled for October 8, 2024.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Remove existing boiler system and changing to a commercial water heater and storage tank to supply hot water to restrooms and showers.
Posted Date
Dec 8, 2025
Due Date
Dec 22, 2025
Release: Dec 8, 2025
Close: Dec 22, 2025
Remove existing boiler system and changing to a commercial water heater and storage tank to supply hot water to restrooms and showers.
AvailableThe project involves replacing an existing boiler system with a commercial water heater and storage tank to supply hot water to restrooms and showers. The work requires removal of the existing boiler and installation of a new commercial water heater and storage tank. Bid documentation is available on the buyer's site (OhioBuys) via the "Link to Bid Source"—BidBanana provides the link but does not host the documents.
Posted Date
Dec 8, 2025
Due Date
Dec 21, 2025
Release: Dec 8, 2025
Close: Dec 21, 2025
The project involves replacing an existing boiler system with a commercial water heater and storage tank to supply hot water to restrooms and showers. The work requires removal of the existing boiler and installation of a new commercial water heater and storage tank. Bid documentation is available on the buyer's site (OhioBuys) via the "Link to Bid Source"—BidBanana provides the link but does not host the documents.
AvailableWork consist of removal of an existing alternate energy AE-32 solar thermal collector and the installation of a new AE-32 (or approved equivalent) solar hot water collector unit. The work includes all associated components such as mounting hardware, plumbing connections, insulation, and integration with the existing solar hot water system.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
Close: Dec 22, 2025
Work consist of removal of an existing alternate energy AE-32 solar thermal collector and the installation of a new AE-32 (or approved equivalent) solar hot water collector unit. The work includes all associated components such as mounting hardware, plumbing connections, insulation, and integration with the existing solar hot water system.
AvailableWork includes electrical upgrade, water heater removal and replacement, and crawl space weatherization; install a 40 gallon, glass lined, minimum. 67 energy factor (ef), power vented, insulated to minimum r-16, gas fired water heater with a 6 year warranty. Include pressure and temperature relief valve, discharge tube to within 6" of floor, condensate pump, owners manual and all duct work to power vent to exterior. Provide separate electrical circuit and new gas piping from shut-off valve to fixture; de-energize outdated hazardous electrical wiring and components to bring wiring to current electrical code. Hazardous wiring may, but is not limited to, knob-and-tube and aluminum wiring. Disconnected knobs may remain installed. Removed items and materials to be properly disposed or recycled. See attached file.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Close: Dec 19, 2025
Work includes electrical upgrade, water heater removal and replacement, and crawl space weatherization; install a 40 gallon, glass lined, minimum. 67 energy factor (ef), power vented, insulated to minimum r-16, gas fired water heater with a 6 year warranty. Include pressure and temperature relief valve, discharge tube to within 6" of floor, condensate pump, owners manual and all duct work to power vent to exterior. Provide separate electrical circuit and new gas piping from shut-off valve to fixture; de-energize outdated hazardous electrical wiring and components to bring wiring to current electrical code. Hazardous wiring may, but is not limited to, knob-and-tube and aluminum wiring. Disconnected knobs may remain installed. Removed items and materials to be properly disposed or recycled. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis