Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 425 CY of special backfill, no.53; 46 TN of l18" revetment, riprap; 488 Ton compacted aggregate; 894 LF of temporary chain-link fence; 1,032 LF of 12" watermain, PVC C900 DR18; See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes water distribution system improvements.
Posted Date
Dec 17, 2025
Due Date
Jan 13, 2026
Release: Dec 17, 2025
Close: Jan 13, 2026
Work includes water distribution system improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of construction services for water distribution system upgrades, including new PVC waterlines, customer service lines, gate valves, and fire hydrants.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
Procurement of construction services for water distribution system upgrades, including new PVC waterlines, customer service lines, gate valves, and fire hydrants.
AvailableThe work generally consist of the following approximate Quantities: Sanitary Sewer Service Stub, PVC, 4" and 6" - 100 LF; Water Main, Trenched, PVC, 2" - 20 LF; Water Main, Trenched, PVC, 4" - 65 LF; Water Main, Trenchless, RJ PVC, 6" - 2,120 LF; Water Main, Trenchless, RJ Ductile Iron with Nitrile Gaskets, 6" - 180 LF; Water Service Pipe, Copper, 1" – 10 LF; Water Service Pipe, Trenchless, PE, 1" - 500 LF; Water Service Pipe, Trenchless, PE, 2" - 150 LF; Water Service Corporation, 1" – 13 EA; Water Service, Corporation, 2" - 3 EA; Water Service Curb Stop and Box, 1" - 11 EA; Water Service Curb Stop and Box, 2" - 1 EA; Gate Valve, 2" - 1 EA; Gate Valve, 4” – 2 EA; Gate Valve, 6" - 9 EA; Fire Hydrant Assembly - 3 EA; Flushing Device Assembly - 1 EA; Fire Hydrant Adjustment - 1 EA; Fire Hydrant Assembly Removal - 3 EA; Valve Box Removal - 6 EA; Water Main Connection No.1 - 1 LS; Water Main Connection No. 2 - 1 LS; Water Main Connection No. 3 - 1 LS; Water Main Connection No. 4 - 1 LS; Water Main Connection No. 5 - 1 LS; Water Main Connection No. 6 - 1 LS; Water Main Connection No. 7 - 1 LS; Water Main Connection No.8 - 1 LS; Water Main Connection No. 9 - 1 LS; Removal of Sidewalk - 45 SY; Sidewalk, PCC, 4" Thick – 15 SY; Sidewalk, PCC, 6" Thick – 30 SY; Detectable Warnings – 28 SF; Pavement Removals - 200 SY; Driveway, PCC, 8” Thick – 30 SY; Granular Surfacing, 6" Thick - 75 TON; Remove and Replace Curb and Gutter, PCC, 3' Wide - 20 LF; Temporary Traffic Control - 1 LS; Seeding, Fertilizing, and Mulching, Type 1 Mixture - 1 LS; Mobilization – 1 LS.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
The work generally consist of the following approximate Quantities: Sanitary Sewer Service Stub, PVC, 4" and 6" - 100 LF; Water Main, Trenched, PVC, 2" - 20 LF; Water Main, Trenched, PVC, 4" - 65 LF; Water Main, Trenchless, RJ PVC, 6" - 2,120 LF; Water Main, Trenchless, RJ Ductile Iron with Nitrile Gaskets, 6" - 180 LF; Water Service Pipe, Copper, 1" – 10 LF; Water Service Pipe, Trenchless, PE, 1" - 500 LF; Water Service Pipe, Trenchless, PE, 2" - 150 LF; Water Service Corporation, 1" – 13 EA; Water Service, Corporation, 2" - 3 EA; Water Service Curb Stop and Box, 1" - 11 EA; Water Service Curb Stop and Box, 2" - 1 EA; Gate Valve, 2" - 1 EA; Gate Valve, 4” – 2 EA; Gate Valve, 6" - 9 EA; Fire Hydrant Assembly - 3 EA; Flushing Device Assembly - 1 EA; Fire Hydrant Adjustment - 1 EA; Fire Hydrant Assembly Removal - 3 EA; Valve Box Removal - 6 EA; Water Main Connection No.1 - 1 LS; Water Main Connection No. 2 - 1 LS; Water Main Connection No. 3 - 1 LS; Water Main Connection No. 4 - 1 LS; Water Main Connection No. 5 - 1 LS; Water Main Connection No. 6 - 1 LS; Water Main Connection No. 7 - 1 LS; Water Main Connection No.8 - 1 LS; Water Main Connection No. 9 - 1 LS; Removal of Sidewalk - 45 SY; Sidewalk, PCC, 4" Thick – 15 SY; Sidewalk, PCC, 6" Thick – 30 SY; Detectable Warnings – 28 SF; Pavement Removals - 200 SY; Driveway, PCC, 8” Thick – 30 SY; Granular Surfacing, 6" Thick - 75 TON; Remove and Replace Curb and Gutter, PCC, 3' Wide - 20 LF; Temporary Traffic Control - 1 LS; Seeding, Fertilizing, and Mulching, Type 1 Mixture - 1 LS; Mobilization – 1 LS.
AvailableReplace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
Posted Date
Nov 7, 2025
Due Date
Jan 14, 2026
Release: Nov 7, 2025
Close: Jan 14, 2026
Replace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →