Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking qualified engineering consulting firms to conduct comprehensive water distribution assessments within epwater's complex distribution system, to include the existing water transfer stations. The assessments will provide evaluations of water distribution and transfer across pressure zones during different supply and demand scenarios, including seasonal variability and water supply, determine operational improvements for hydraulic performance, and long-term reliability
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
El Paso Water seeks qualified engineering consulting firms to provide professional services for a comprehensive Water Distribution Assessment: hydraulic modeling (peak/shoulder/winter, with/without surface water), site inspections, evaluation of water transfer stations, identification of operational improvements and O&M considerations, and cost estimates. Minimum requirements include Texas-registered professional engineers (min. 8 years experience), specified key team roles (Principal-in-Charge, PM, Design Engineer, Hydraulic Modeler, QA/QC Lead, Estimator), submission via EPWater IonWave, and $1,000,000 professional liability insurance.
Posted Date
Dec 7, 2025
Due Date
Jan 14, 2026
Release: Dec 7, 2025
Close: Jan 14, 2026
El Paso Water seeks qualified engineering consulting firms to provide professional services for a comprehensive Water Distribution Assessment: hydraulic modeling (peak/shoulder/winter, with/without surface water), site inspections, evaluation of water transfer stations, identification of operational improvements and O&M considerations, and cost estimates. Minimum requirements include Texas-registered professional engineers (min. 8 years experience), specified key team roles (Principal-in-Charge, PM, Design Engineer, Hydraulic Modeler, QA/QC Lead, Estimator), submission via EPWater IonWave, and $1,000,000 professional liability insurance.
Premium
Access the largest public sector contact database
Emergency electrical distribution damage assessment and wire guarding services.
Posted Date
Jan 7, 2025
Due Date
Oct 1, 2026
Release: Jan 7, 2025
Close: Oct 1, 2026
Emergency electrical distribution damage assessment and wire guarding services.
AvailableThis project consists of the review and assessment of approximately 210 water distribution and auxiliary hydrant valves and 81 hydrants to collect detailed condition data capable of guiding future system improvement decisions.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
This project consists of the review and assessment of approximately 210 water distribution and auxiliary hydrant valves and 81 hydrants to collect detailed condition data capable of guiding future system improvement decisions.
AvailableThis project consists of the review and assessment of approximately 210 water distribution and auxiliary hydrant valves and 81 hydrants to collect detailed condition data capable of guiding future system improvement decisions.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
This project consists of the review and assessment of approximately 210 water distribution and auxiliary hydrant valves and 81 hydrants to collect detailed condition data capable of guiding future system improvement decisions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis