Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract I - Phase I - 4,100 LF 8" PE DR 11, 10 - 8" Gate Valves, 2 - Fire Hydrants and Valves, 60 LF - Directional Boring & 12" PE DR 11 Casing, 5 - Connections to Existing Water Lines, - Extension - 2,650 LF 8" PE DR 11, 2,950 L.F. 12" PE DR 11, 5 - 8" Gate Valves, 3 - 12" Gate Valves, 2 - Fire Hydrants and Valves, 280 L.F. Directional Bore & 12" Steel Casing, 2 - Connections to Existing Waterline and all appurtenances. Contract II - Business Park Phase I - 1,480 LF 8" PE DR 13 Gravity Sewer Line, 5 - Manholes - Sparks North Addition - 1,830 LF 8" PE DR 13 Gravity Sewer Line, 6 - Manholes and all appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Includes rehabilitation and improvements to the existing wastewater treatment system, the sewage pumping system, and the sewer gravity system. Installation of new aerators at the wastewater treatment facility, levee repairs at the lagoon, chlorine contact chamber improvements, and membrane liner anchorage repairs for the base bid. The alternate bid work shall include sludge removal, dewatering, and disposal offsite, as well as pump station rehabilitation work and collection system rehabilitation.
Posted Date
Jan 16, 2026
Due Date
Feb 17, 2026
Release: Jan 16, 2026
Close: Feb 17, 2026
Includes rehabilitation and improvements to the existing wastewater treatment system, the sewage pumping system, and the sewer gravity system. Installation of new aerators at the wastewater treatment facility, levee repairs at the lagoon, chlorine contact chamber improvements, and membrane liner anchorage repairs for the base bid. The alternate bid work shall include sludge removal, dewatering, and disposal offsite, as well as pump station rehabilitation work and collection system rehabilitation.
AvailableProvide administration of a water improvement project with financial assistance from the CDBG Wastewater Drinking Water Program.
Posted Date
Jan 15, 2026
Due Date
Feb 2, 2026
Release: Jan 15, 2026
Close: Feb 2, 2026
Provide administration of a water improvement project with financial assistance from the CDBG Wastewater Drinking Water Program.
AvailableProject consists of improvements to an existing booster pump station (installing a new emergency backup generator and ats and replacing pumps, piping, mcc, msb, and control panels); improvements to three existing water storage tanks (coating tank interiors and exteriors and installing antennas and control panels); improvements to three existing wells (replacing pumps, motors, and piping; new electrical; and building upgrades and repairs); and constructing a new central electrical and control building for the three existing wells (new msb, mcc, control panels, and chlorine room).
Posted Date
Dec 19, 2025
Due Date
Feb 19, 2026
Release: Dec 19, 2025
Close: Feb 19, 2026
Project consists of improvements to an existing booster pump station (installing a new emergency backup generator and ats and replacing pumps, piping, mcc, msb, and control panels); improvements to three existing water storage tanks (coating tank interiors and exteriors and installing antennas and control panels); improvements to three existing wells (replacing pumps, motors, and piping; new electrical; and building upgrades and repairs); and constructing a new central electrical and control building for the three existing wells (new msb, mcc, control panels, and chlorine room).
Rehabilitation of four existing wastewater pump stations, electrical modifications to two wastewater pump stations and one water booster station, and installation of approximately 1,200 LF of new gravity sewer line with associated manholes.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Rehabilitation of four existing wastewater pump stations, electrical modifications to two wastewater pump stations and one water booster station, and installation of approximately 1,200 LF of new gravity sewer line with associated manholes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis