Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of constructing approx 3,584 LF of proposed water line, mainly consisting of 12" dia but also including some 8" and 20" diameter lines. Approx 359 LF of that is proposed by boring. Project also includes approx 1,582 LF of proposed pvc gravity sewer line, consisting of 10" and 12" diameter lines. Approx 276 LF of that is proposed by boring.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Walhalla is soliciting bids for the Water & Sewer Improvements Project - Division IV, which includes installing approximately 3,600 linear feet of 10-inch water lines in the Poplar Springs Road area and related work. The project is to be delivered using Design-Bid-Build; bid documents are available from Summit Engineering Group for a non-refundable fee of $150 per set. Bids are due December 18, 2025 at 2:00 PM local time and questions should be emailed to the project coordinator prior to the bid opening.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
The City of Walhalla is soliciting bids for the Water & Sewer Improvements Project - Division IV, which includes installing approximately 3,600 linear feet of 10-inch water lines in the Poplar Springs Road area and related work. The project is to be delivered using Design-Bid-Build; bid documents are available from Summit Engineering Group for a non-refundable fee of $150 per set. Bids are due December 18, 2025 at 2:00 PM local time and questions should be emailed to the project coordinator prior to the bid opening.
AvailableWork includes sanitary sewer improvements project.
Posted Date
Nov 13, 2025
Due Date
Dec 22, 2025
Release: Nov 13, 2025
Close: Dec 22, 2025
Work includes sanitary sewer improvements project.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Available2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis