Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing, installing and testing of aeration blowers, sludge dewatering box, piping, electrical modifications etc., including testing, bypass wastewater pumpong, unclassified excavation, backfill, tie-ins working in close proximity with other utilities and structures, restoration and all other appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Remove existing secondary manual bar screen. Furnish and install a new 1/8 opening front-cleaning, front-return link driven mechanically cleaned bar screen assembly and any auxiliary equipment or accessories. Furnish and install an interleaving, dual auger washer compactor assembly. A single unit shall provide washing and compacting action on wastewater screenings. The equipment shall be fabricated, assembled, erected, and placed in proper operating condition.
Posted Date
Dec 4, 2025
Due Date
Feb 11, 2026
Release: Dec 4, 2025
Close: Feb 11, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove existing secondary manual bar screen. Furnish and install a new 1/8 opening front-cleaning, front-return link driven mechanically cleaned bar screen assembly and any auxiliary equipment or accessories. Furnish and install an interleaving, dual auger washer compactor assembly. A single unit shall provide washing and compacting action on wastewater screenings. The equipment shall be fabricated, assembled, erected, and placed in proper operating condition.
Removing and replacing 3 flat roofs at the wastewater treatment plant.
Posted Date
Jan 8, 2026
Due Date
Feb 4, 2026
Release: Jan 8, 2026
Close: Feb 4, 2026
Removing and replacing 3 flat roofs at the wastewater treatment plant.
AvailableWork includes wastewater treatment plant improvements electrical equipment.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
Work includes wastewater treatment plant improvements electrical equipment.
AvailableContract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Contract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →