Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 1,550 LF of 12" sanitary sewer; 400 LF of 8" sanitary sewer; 1,000 SF of gravel road construction. Work also includes, but is not limited to, tree clearing and brushing, wastewater bypass pumping, dewatering, and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Premium
Access the largest public sector contact database
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
Posted Date
Dec 4, 2025
Due Date
Jan 7, 2026
Release: Dec 4, 2025
Close: Jan 7, 2026
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
AvailableRFP for the construction of Wastewater Collection System Improvements, Contract 3 - Lift Station #3 & #4 Rehabilitation.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
RFP for the construction of Wastewater Collection System Improvements, Contract 3 - Lift Station #3 & #4 Rehabilitation.
AvailableWastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
Posted Date
Jun 27, 2025
Due Date
Dec 12, 2025
Release: Jun 27, 2025
Close: Dec 12, 2025
Wastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis