Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wastewater collection system rehabilitation- cured in place pipe project 2024.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Work includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists approx. 1,950 lf of 10” and 12” cured-in-place-pipe along with service reconnections and post videotaping.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
The work consists approx. 1,950 lf of 10” and 12” cured-in-place-pipe along with service reconnections and post videotaping.
AvailableRehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe and manhole rehabilitation.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Rehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe and manhole rehabilitation.
AvailableIncludes rehabilitation and improvements to the existing wastewater treatment system, the sewage pumping system, and the sewer gravity system. Installation of new aerators at the wastewater treatment facility, levee repairs at the lagoon, chlorine contact chamber improvements, and membrane liner anchorage repairs for the base bid. The alternate bid work shall include sludge removal, dewatering, and disposal offsite, as well as pump station rehabilitation work and collection system rehabilitation.
Posted Date
Jan 16, 2026
Due Date
Feb 17, 2026
Release: Jan 16, 2026
Close: Feb 17, 2026
Includes rehabilitation and improvements to the existing wastewater treatment system, the sewage pumping system, and the sewer gravity system. Installation of new aerators at the wastewater treatment facility, levee repairs at the lagoon, chlorine contact chamber improvements, and membrane liner anchorage repairs for the base bid. The alternate bid work shall include sludge removal, dewatering, and disposal offsite, as well as pump station rehabilitation work and collection system rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →