Seeking bids from firms interested and qualified to provide pump
repairs for the Wastewater Treatment Plants and Lift Stations. A. The Contractor shall disassemble, inspect, repair, and rebuild pumps.
B. The Contractor shall perform repairs to the following parts of pumps, including, but not limited to, stator, shaft, impeller, volute, seals, gaskets, stuffing box, packing gland, and bearings. C. General machine work and/or repairs shall consist of, but not be limited to, balancing, welding, straightening, grinding, customer part manufacturing, shaft rebuilding and fabricating, sand blasting, and coating of the pump. D. The Contractor shall clean using steam, grit, or solvent to obtain accurate measurements and for non-destructive evaluation. E. All repairs shall be in accordance with current pump nameplate data and conditions, drawings, standards, and/or OEM specifications. If the pump is missing the nameplate data, refer to CCW staff for additional information. F. After repairs, the pumps must be repainted to the manufacturer's recommendations
and specifications, in a color approved by CCW, and supercoated equal to the manufacturer's recommendations or better. G. While in the Contractor’s possession, CCW equipment must be properly stored and
secured at all times. H. CCW reserves the right to inspect the pump at any time during the repairs. I. The Contractor's facilities may be subject to inspection at any time by a CCW staff. When deemed appropriate, CCW reserves the right to use third-party inspection services at CCW’s expense. J. CCW reserves the right to audit the Contractor’s project cost at any time.
Available