Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Warehouse freezer replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Walk-in cooler/freezer replacement.
Posted Date
Jan 25, 2026
Due Date
Feb 12, 2026
Release: Jan 25, 2026
Close: Feb 12, 2026
Walk-in cooler/freezer replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the existing walk in freezer and cooler at the loading dock doors in building includes removal of the decommissioned freezer/cooler in building 7.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Replacement of the existing walk in freezer and cooler at the loading dock doors in building includes removal of the decommissioned freezer/cooler in building 7.
AvailableWork includes removal of the existing walk-in freezer unit and the installation of a new, energy-efficient, code-compliant walk-in freezer system that meets operational and safety requirements of the facility. The current unit that will need to be removed is approximately an 8' x 8' freezer and should be replaced with one of similar size.
Posted Date
Oct 6, 2025
Due Date
Jan 29, 2026
Release: Oct 6, 2025
Close: Jan 29, 2026
Work includes removal of the existing walk-in freezer unit and the installation of a new, energy-efficient, code-compliant walk-in freezer system that meets operational and safety requirements of the facility. The current unit that will need to be removed is approximately an 8' x 8' freezer and should be replaced with one of similar size.
AvailableThe project consists of walk-in cooler and freezer replacement along with related mechanical, plumbing, electrical, fire suppression and general construction renovations.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The project consists of walk-in cooler and freezer replacement along with related mechanical, plumbing, electrical, fire suppression and general construction renovations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →