Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of approx. 33,270 LF of 8" and 10" waterline. The project includes the waterline, a master meter vault, a PRV vault, two water crossings, and all related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Boiler Interconnection Project.
Posted Date
Nov 27, 2025
Due Date
Dec 22, 2025
Release: Nov 27, 2025
Close: Dec 22, 2025
Boiler Interconnection Project.
AvailablePremium
Access the largest public sector contact database
Project consists of the installation of a new utility-to-utility water meter connection including meter vault, meter, valving, bypass piping and approx 870 LF of 12" dip.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Project consists of the installation of a new utility-to-utility water meter connection including meter vault, meter, valving, bypass piping and approx 870 LF of 12" dip.
AvailableThe project requires permanent abandonment of three existing interconnections between Eastern Municipal Water District (EMWD) and Western Municipal Water District (WMWD) at the Alessandro, Westgate, and Eastgate service connections. It is a public bid issued by Western Municipal Water District with a pre-bid (optional) Teams meeting and a response deadline of January 15, 2026.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The project requires permanent abandonment of three existing interconnections between Eastern Municipal Water District (EMWD) and Western Municipal Water District (WMWD) at the Alessandro, Westgate, and Eastgate service connections. It is a public bid issued by Western Municipal Water District with a pre-bid (optional) Teams meeting and a response deadline of January 15, 2026.
AvailableThe major features of the Project generally involves the following: In-Town Water Line Replacement; Service Line and Meter Setting Replacement; Silver Run Water Line Replacement & Extension; High Street – Smith Hill Interconnection & Pressure Reducing Valve Installation; Valve Replacements; Fire Hydrant Replacement; Leak Detection Meter Installation; Pressure Reducing Valve Rehabilitation; Tank Cleaning, Inspection, and Rehabilitation.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
The major features of the Project generally involves the following: In-Town Water Line Replacement; Service Line and Meter Setting Replacement; Silver Run Water Line Replacement & Extension; High Street – Smith Hill Interconnection & Pressure Reducing Valve Installation; Valve Replacements; Fire Hydrant Replacement; Leak Detection Meter Installation; Pressure Reducing Valve Rehabilitation; Tank Cleaning, Inspection, and Rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.