Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is an Invitation to Bid (ITB) to replace a water main on Vine Street from Liberty to McMicken in Cincinnati issued by the Water Works, Division of Engineering. The solicitation was posted on Dec 10, 2025 and the response deadline shown on the aggregator is in early January 2026 (highergov lists Jan 7, 2026). Documents are not provided on the aggregator and the listing directs interested vendors to the City of Cincinnati Vendor Self Service (Advantage4) portal to find official solicitation materials and response instructions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
East vine street wall replacement.
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
East vine street wall replacement.
AvailablePremium
Access the largest public sector contact database
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 15, 2025
Release: Nov 19, 2025
Close: Dec 15, 2025
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
AvailableWater main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
AvailableThe Quarryville Borough Authority issued an Invitation to Bid (ITB) for the North Hess Street Water Main Replacement to install approximately 380–390 feet of 8-inch water main, valves, hydrant(s), and services, with trench restoration and related work. Bids must be submitted online via PennBid (BonfireHub) and a mandatory pre-bid meeting is scheduled for January 22, 2026 at 9:00 AM at the Quarryville Borough Authority office. Bids are due online by 10:00 AM on February 10, 2026, and a 10% bid bond and performance/payment bonds (100% of contract) will be required of the successful bidder.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
The Quarryville Borough Authority issued an Invitation to Bid (ITB) for the North Hess Street Water Main Replacement to install approximately 380–390 feet of 8-inch water main, valves, hydrant(s), and services, with trench restoration and related work. Bids must be submitted online via PennBid (BonfireHub) and a mandatory pre-bid meeting is scheduled for January 22, 2026 at 9:00 AM at the Quarryville Borough Authority office. Bids are due online by 10:00 AM on February 10, 2026, and a 10% bid bond and performance/payment bonds (100% of contract) will be required of the successful bidder.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis