Work includes 436 SY type b stabilization; 405 SY optional base, base group 04; 222 SY milling existing asphalt pavement, 2" avg depth; 569 sy superpave asphaltic conc, traffic c; 1 EA inlets, curb, type p-2, <10'; 1 EA inlets, curb, type p-4, <10'; 1 EA manholes, p-8, <10'; 32 lf pipe culvert, rcp,round, 18"s/cd; 40 LF pipe culvert, RCP,round, 24"s/cd; 52 LF concrete curb & gutter, type f; 125 LF concrete curb, type d; 38 SY concrete sidewalk and driveways, 6" thick; 87 SY concrete ditch pavement, non reinforced, 6"; 82 ton riprap, rubble, f&i, ditch lining; 240 SY articulating concrete block revetment system, thickness 4". See outside link.