Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and replace the 6-inch valve located in the meter pit, along with all associated parts and hardware
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Kern County is soliciting bids for the KCFD HQ Asphalt Replacement project at the Kern County Fire Headquarters in Bakersfield, CA, to remove existing asphalt and install new asphalt and related concrete work with an estimated value of $160,000. A mandatory pre-bid job walk is scheduled for 2026-01-30 at 9:00 AM local time; the contract requires completion within 30 working days and requires a California A license and DIR registration for public works. Bids are due 2026-02-13 at 11:00 AM PST, and the posting was published 2026-01-22.
Posted Date
Jan 22, 2026
Due Date
Feb 13, 2026
Release: Jan 22, 2026
Close: Feb 13, 2026
Kern County is soliciting bids for the KCFD HQ Asphalt Replacement project at the Kern County Fire Headquarters in Bakersfield, CA, to remove existing asphalt and install new asphalt and related concrete work with an estimated value of $160,000. A mandatory pre-bid job walk is scheduled for 2026-01-30 at 9:00 AM local time; the contract requires completion within 30 working days and requires a California A license and DIR registration for public works. Bids are due 2026-02-13 at 11:00 AM PST, and the posting was published 2026-01-22.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project will involve the installation of approx 11 gate valves and 14 insertion valves, as well as the replacement of 21 gate valves. Work will include efforts in traffic control, sediment and erosion control, and surface restoration of disturbed roadways and driveways. Traffic control 1 ls, erosion and sediment control 1 ls, 4" gate valve replacement 6 ea, 6" gate valve replacement 13 ea, 8" gate valve replacement 1 ea, 10" gate valve replacement 1 ea, 4" gate valve installation 5 ea, 6" gate valve installation 6 ea, 10" insertion valve installation 6 ea, see attached file.
Posted Date
-
Due Date
Feb 25, 2026
Close: Feb 25, 2026
The project will involve the installation of approx 11 gate valves and 14 insertion valves, as well as the replacement of 21 gate valves. Work will include efforts in traffic control, sediment and erosion control, and surface restoration of disturbed roadways and driveways. Traffic control 1 ls, erosion and sediment control 1 ls, 4" gate valve replacement 6 ea, 6" gate valve replacement 13 ea, 8" gate valve replacement 1 ea, 10" gate valve replacement 1 ea, 4" gate valve installation 5 ea, 6" gate valve installation 6 ea, 10" insertion valve installation 6 ea, see attached file.
AvailableWork includes demolition and disposal of three existing rooftop HVAC units and installation of Owner-furnished Contractor-installed Trane HVAC units including all new rooftop ductwork, isolation system, roof repair, bracing and framing. Work also includes removal and replacement of all interior VAV units including associated ceiling removal and replacement, flex duct replacement at supply and returns, piping and valves as shown in the bid plans and specifications.
Posted Date
Dec 29, 2025
Due Date
Jan 27, 2026
Release: Dec 29, 2025
Close: Jan 27, 2026
Work includes demolition and disposal of three existing rooftop HVAC units and installation of Owner-furnished Contractor-installed Trane HVAC units including all new rooftop ductwork, isolation system, roof repair, bracing and framing. Work also includes removal and replacement of all interior VAV units including associated ceiling removal and replacement, flex duct replacement at supply and returns, piping and valves as shown in the bid plans and specifications.
AvailableRelease: Jan 25, 2026
Close: Mar 4, 2026
Pressure reducing valve replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →