Summary
Vacant unit renovations 2 units at cherry hill homes work includes Remove and properly dispose of all Bulk Trash, Furniture and Miscellaneous Items in the Unit and Outside; Remove all existing appliances and range hood and dispose if needed; Install closet shelving/closet rod as necessary; Bathrooms: Install Vanity Cabinet w/ Vanity Bowl and faucet delta faucet only; Supply and install One (1) new 16-inch elongated toilet and seat; Kitchen: Replace damaged or worn cabinetry with HUD Severe Use base and wall Magnolia Cabinets; Install Postformed Wilsonart Black Granite Laminate countertops. Mechanical / Plumbing:
Check and Inspect Gas Distribution (Stove) for service and repair any leaks; Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit. Electrical: Replace all Switches / Receptacles and metal cover plates. Ivory color; Replace existing raceways and install new raceways through out entire unit. Doors & Windows: Replace all interior doors with solid wood doors; Supply and install vertical blinds in all windows; Painting/Drywall Repair:
Supply all materials to Paint the Entire Units to Include: Walls and ceilings shall be painted with two finish coats eggshell latex; Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. Flooring: Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 8-12MIL flooring.