Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Utilities plant repairs and pump, panel, motor and pipeline repairs and installation continuing services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Electric motor and pump repairs.
Posted Date
Dec 16, 2025
Due Date
Jan 7, 2026
Release: Dec 16, 2025
Close: Jan 7, 2026
Electric motor and pump repairs.
AvailableProvide construction management at risk continuing services.
Posted Date
Nov 7, 2025
Due Date
Jan 7, 2026
Release: Nov 7, 2025
Close: Jan 7, 2026
Provide construction management at risk continuing services.
AvailableProvide professional engineering services for projects within the utility work program consisting of studies, design, permitting, and certification for all types of water and wastewater pipelines, facility improvements, lift station rehabilitation, pump station improvements, and repairs and upgrades to the water and wastewater utility system.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Provide professional engineering services for projects within the utility work program consisting of studies, design, permitting, and certification for all types of water and wastewater pipelines, facility improvements, lift station rehabilitation, pump station improvements, and repairs and upgrades to the water and wastewater utility system.
AvailableDesign-Build-Scope of work will include, but is not limited to, structural concrete repairs, joint sealant replacement, coping repairs, concrete deck repairs, and the replacement of deteriorated steel lintels.
Posted Date
Dec 17, 2025
Due Date
Jan 9, 2026
Release: Dec 17, 2025
Close: Jan 9, 2026
Design-Build-Scope of work will include, but is not limited to, structural concrete repairs, joint sealant replacement, coping repairs, concrete deck repairs, and the replacement of deteriorated steel lintels.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →