Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the following: Surface blading the traveled way to a condition that facilitates traffic and proper drainage. Blading includes shaping the crown or slope of the travel way and ditches. Adding well graded aggregate to reestablish the gradient where needed, and compacting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Forest Service (Six Rivers National Forest, Gasquet Ranger District) issued Solicitation No. 127EAW26Q0001 to procure road repair services for Fox Ridge (16N03) to restore safe ingress/egress for wildfire response, Forest Service personnel, and public use. The procurement is a Combined Synopsis/Solicitation (RFQ), NAICS 237310, set aside entirely for small business concerns. Work includes surface blading, shaping, adding and compacting aggregate, and must begin within 10 calendar days after notice to proceed and be completed within 45 calendar days.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Forest Service (Six Rivers National Forest, Gasquet Ranger District) issued Solicitation No. 127EAW26Q0001 to procure road repair services for Fox Ridge (16N03) to restore safe ingress/egress for wildfire response, Forest Service personnel, and public use. The procurement is a Combined Synopsis/Solicitation (RFQ), NAICS 237310, set aside entirely for small business concerns. Work includes surface blading, shaping, adding and compacting aggregate, and must begin within 10 calendar days after notice to proceed and be completed within 45 calendar days.
Kern County Public Works is soliciting sealed bids for road resurfacing on Wheeler Ridge Road from Laval Road to Santa Elena Drive, including hot mix asphalt paving, inductive loop detector installation, and thermoplastic stripes and pavement markings. Bids are due Feb 4, 2026 at 11:00 AM PST and must be submitted in paper format to Kern County Public Works (mail or in-person/courier addresses provided on the posting). The solicitation requires specific license classifications (A or C-12), bid/payment/performance bonds, and lists an estimated bid value of $3,000,000.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
Kern County Public Works is soliciting sealed bids for road resurfacing on Wheeler Ridge Road from Laval Road to Santa Elena Drive, including hot mix asphalt paving, inductive loop detector installation, and thermoplastic stripes and pavement markings. Bids are due Feb 4, 2026 at 11:00 AM PST and must be submitted in paper format to Kern County Public Works (mail or in-person/courier addresses provided on the posting). The solicitation requires specific license classifications (A or C-12), bid/payment/performance bonds, and lists an estimated bid value of $3,000,000.
AvailableThis RFP is for the replacement of Bridge 1-185 on Oak Ridge Road. The project involves replacing an existing corrugated metal pipe with a precast concrete frame, minor roadway reconstruction, guardrail installation, and placement of riprap to address corrosion and hydraulic inadequacy.
Posted Date
Dec 22, 2025
Due Date
Jan 20, 2026
Release: Dec 22, 2025
Close: Jan 20, 2026
This RFP is for the replacement of Bridge 1-185 on Oak Ridge Road. The project involves replacing an existing corrugated metal pipe with a precast concrete frame, minor roadway reconstruction, guardrail installation, and placement of riprap to address corrosion and hydraulic inadequacy.
Work include road landslip repair.
Posted Date
Jan 2, 2026
Due Date
Jan 29, 2026
Release: Jan 2, 2026
Close: Jan 29, 2026
Work include road landslip repair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →