Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Surface Forces Logistics Center (US Coast Guard) issued Synopsis Solicitation 70Z08526Q0002157 to replace, install, and calibrate CAT 10R-9661 (Kit ELEK GP) controllers on both ship-service diesel generators (SSDGs) aboard USCGC Gasconade in St. Louis, MO. The scope includes removal of old controllers, installation and calibration per manufacturer instructions, delivery of two installed and calibrated controllers with calibration documentation, and completion within five business days; the procurement is set aside for Small Business under NAICS 336611. The solicitation was posted Dec 23, 2025 and is due Jan 6, 2026 — the official posting is on SAM.gov.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This is a Sources Sought notice issued by the Surface Forces Logistics Center (U.S. Coast Guard) seeking information for FY26 drydock availability for the USCGC GASCONADE (75' inland buoy tender) to perform drydock work including removal/inspection/reinstallation of steering/rudders, propulsion shafting, propellers, keel coolers and hull inspections. The posting is a market‑research/requirements‑gathering Sources Sought (not a grant) and is soliciting industry capability information. Responses are due Jan 15, 2026; the notice is active and open as of 2025-12-19.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
This is a Sources Sought notice issued by the Surface Forces Logistics Center (U.S. Coast Guard) seeking information for FY26 drydock availability for the USCGC GASCONADE (75' inland buoy tender) to perform drydock work including removal/inspection/reinstallation of steering/rudders, propulsion shafting, propellers, keel coolers and hull inspections. The posting is a market‑research/requirements‑gathering Sources Sought (not a grant) and is soliciting industry capability information. Responses are due Jan 15, 2026; the notice is active and open as of 2025-12-19.
AvailableUS Coast Guard Cutter (CGC) GASCONADE (WLR 75401) is a 75' inland buoy tender class cutter currently home ported in St. Louis, MO. Worklist will include but is not limited to tender steering and flanking rudders remove, inspect and reinstall, propulsion shafting remove, inspect and reinstall, propellers remove, inspect and reinstall, keel coolers remove, inspect and reinstall, hull underwater body inspect.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
US Coast Guard Cutter (CGC) GASCONADE (WLR 75401) is a 75' inland buoy tender class cutter currently home ported in St. Louis, MO. Worklist will include but is not limited to tender steering and flanking rudders remove, inspect and reinstall, propulsion shafting remove, inspect and reinstall, propellers remove, inspect and reinstall, keel coolers remove, inspect and reinstall, hull underwater body inspect.
Provide new panelboards and motor control center. The existing electrical equipment has met and exceeded its life expectancy and needs to be replaced with new. Disconnect all existing branch circuits and remove as called for in these contract documents. Provide new branch circuits from the new equipment as indicated.
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
Close: Jan 15, 2026
Provide new panelboards and motor control center. The existing electrical equipment has met and exceeded its life expectancy and needs to be replaced with new. Disconnect all existing branch circuits and remove as called for in these contract documents. Provide new branch circuits from the new equipment as indicated.
AvailableNSN 6110001019821 Panel, Control Qty 4 Ea.
Posted Date
Jan 8, 2026
Due Date
Jan 20, 2026
Release: Jan 8, 2026
Close: Jan 20, 2026
NSN 6110001019821 Panel, Control Qty 4 Ea.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis