Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Recurring tree care, landscaping, lawn maintenance services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Coast Guard (Department of Homeland Security) solicits fixed-price construction services to rebuild or replace equipment for the mooring basin bubble (weed) curtain at USCG Station Marathon, FL. The solicitation (30314PR260000001) is a Small Business set-aside, evaluation by Best Value, and requires the contractor to provide all labor, materials, and equipment to inspect, rebuild, replace compressors/fans, clean underwater components and perform performance testing. Proposals are due Jan 28, 2026 at 3:00 PM EST; award is anticipated about 10 business days after close (approx. Feb 9, 2026).
Posted Date
Jan 8, 2026
Due Date
Jan 28, 2026
Release: Jan 8, 2026
Close: Jan 28, 2026
The U.S. Coast Guard (Department of Homeland Security) solicits fixed-price construction services to rebuild or replace equipment for the mooring basin bubble (weed) curtain at USCG Station Marathon, FL. The solicitation (30314PR260000001) is a Small Business set-aside, evaluation by Best Value, and requires the contractor to provide all labor, materials, and equipment to inspect, rebuild, replace compressors/fans, clean underwater components and perform performance testing. Proposals are due Jan 28, 2026 at 3:00 PM EST; award is anticipated about 10 business days after close (approx. Feb 9, 2026).
AvailableMooring basin bubble curtain repair.
Posted Date
Jan 8, 2026
Due Date
Jan 28, 2026
Release: Jan 8, 2026
Close: Jan 28, 2026
Mooring basin bubble curtain repair.
AvailableThe work will consist of providing all labor, equipment and material for the restoration of wall and floor tile and grout surfaces in four bathrooms equaling 890 SF. Restore the appearance of tile and grout surfaces, remove stains, dirt, and contaminants, repair any damaged grout or tiles and apply a high-quality sealant to protect surfaces and extend longevity.The project also entails a complete renovation of the men's bathroom shower area at the USCG Sector Virginia Logistics Building. This work includes providing all necessary labor, equipment, and materials to divide the existing single shower into two separate shower stalls. Furthermore, the scope of work includes the construction of a dedicated changing area immediately preceding the shower entrances, providing users with a private space for preparation. See attached file.
Posted Date
Jan 21, 2026
Due Date
Feb 6, 2026
Release: Jan 21, 2026
Close: Feb 6, 2026
The work will consist of providing all labor, equipment and material for the restoration of wall and floor tile and grout surfaces in four bathrooms equaling 890 SF. Restore the appearance of tile and grout surfaces, remove stains, dirt, and contaminants, repair any damaged grout or tiles and apply a high-quality sealant to protect surfaces and extend longevity.The project also entails a complete renovation of the men's bathroom shower area at the USCG Sector Virginia Logistics Building. This work includes providing all necessary labor, equipment, and materials to divide the existing single shower into two separate shower stalls. Furthermore, the scope of work includes the construction of a dedicated changing area immediately preceding the shower entrances, providing users with a private space for preparation. See attached file.
AvailableProvide landscaping services.
Posted Date
Jan 12, 2026
Due Date
Feb 17, 2026
Release: Jan 12, 2026
Close: Feb 17, 2026
Provide landscaping services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis