Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovation of approx. 3,425 SF on the first floor of the Upstate Community Campus to replace a Level 1 existing ED Xray machine and update the finishes in the room, create new Level 1 imaging spaces including an MRI suite including a patient holding area, two CT rooms with shared control room, CT patient prep room, radiology reading room, women's and men's locker rooms, staff toilet rooms, and other building and staff support spaces under Article 28 with the NYS Department of Health. This work includes to selective demolition, hazardous material abatement, general construction, structural, mechanical, electrical, HVAC, plumbing, sprinklers, and coordination with new imaging equipment which will be supplied by others. There will be associated MEP work in the basement and on the roof, including a new chiller on the roof. The roof was recently replaced and is currently under warranty and any work on roof must not void the existing warranty.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes structural steel framing, mri or ct equipment installation, demolition and re-routing of existing underground utilities, rf shielding, infection control measures and icra requirements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Work includes structural steel framing, mri or ct equipment installation, demolition and re-routing of existing underground utilities, rf shielding, infection control measures and icra requirements.
AvailableDemolition of existing mri space for installation of new siemens mri. This will involve removal of existing mri shielding and replaced with new shielding system. Opening of roof area for new roof hatch for removal and installation of mri. Structural steel, electrical, mechanical, medical gases, paint and paint area, and install new millwork.
Posted Date
Oct 15, 2025
Due Date
Dec 19, 2025
Release: Oct 15, 2025
Close: Dec 19, 2025
Demolition of existing mri space for installation of new siemens mri. This will involve removal of existing mri shielding and replaced with new shielding system. Opening of roof area for new roof hatch for removal and installation of mri. Structural steel, electrical, mechanical, medical gases, paint and paint area, and install new millwork.
AvailableWater main replacement.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Water main replacement.
AvailableRelease: -
Close: Dec 19, 2025
Water main replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis