Summary
The Kansas City Board of Public Utilities (BPU) is soliciting proposals to replace the existing uninterruptible power supply (UPS) at its Electric Control Center in Kansas City, KS. The scope includes disconnecting, removing and disposing of existing UPS systems and parallel panel, supplying and installing new 30 kVA UPS systems with a parallel cabinet, installing feeders and control wiring, reusing the existing interlock key system, and performing primary injection testing for new breakers; the installation requires one complete outage of up to 8 hours. The contractor is responsible for providing labor and materials; a mandatory pre-bid meeting is listed for 2026-06-30 and the bid closes on 2026-07-20.