Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace, dispose and install the data center UPS (uninterruptible power supplies) units and power transfer switches.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide UPS installation.
Posted Date
Dec 31, 2025
Due Date
Feb 4, 2026
Release: Dec 31, 2025
Close: Feb 4, 2026
Provide UPS installation.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide a comprehensive installation of county intermediate school district filter first replacement installation. The existing fixtures need to be removed and the new fixture to be installed with the necessary trim. Remove and dispose of the existing fixture off-site. Installation of the new fixture including but not limited to all necessary supply, sanitary, vent piping and electrical work from the existing fixture removal. Caulking of all new fixtures and all clean up. See attached file.
Posted Date
Jan 20, 2026
Due Date
Feb 4, 2026
Release: Jan 20, 2026
Close: Feb 4, 2026
Provide a comprehensive installation of county intermediate school district filter first replacement installation. The existing fixtures need to be removed and the new fixture to be installed with the necessary trim. Remove and dispose of the existing fixture off-site. Installation of the new fixture including but not limited to all necessary supply, sanitary, vent piping and electrical work from the existing fixture removal. Caulking of all new fixtures and all clean up. See attached file.
AvailableUPS battery replacement. 1 EA. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
UPS battery replacement. 1 EA. See attached file.
AvailableProvide monitoring/assessment, maintenance, repair, and/or installation services related to underground and above-ground utility systems.
Posted Date
Oct 31, 2025
Due Date
Jan 30, 2026
Release: Oct 31, 2025
Close: Jan 30, 2026
Provide monitoring/assessment, maintenance, repair, and/or installation services related to underground and above-ground utility systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →