Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of upgrade and replacement of the roof.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide maintenance and upgrade of existing A/V system and/or new installation information technology.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Close: Dec 12, 2025
Provide maintenance and upgrade of existing A/V system and/or new installation information technology.
Premium
Access the largest public sector contact database
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Jan 21, 2026
Release: Oct 28, 2025
Close: Jan 21, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailableRemove and replace the existing roofing system.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Remove and replace the existing roofing system.
AvailableWork consists of Motor Pool Heating, Ventilation, and Air Conditioning (“HVAC”) and Roof Upgrade project. The Work, includes, but is not limited to: Removal of existing roof on main building; Installation of new roof on main building; Extend main building parapet, clad with metal panel; Install new skylight; Replace damaged interior ceiling tile with new ceiling tile; Supply new door; Supply rooftop safety equipment; Replacement of entire HVAC building control system with the Schneider Electric EcoStruxture.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Work consists of Motor Pool Heating, Ventilation, and Air Conditioning (“HVAC”) and Roof Upgrade project. The Work, includes, but is not limited to: Removal of existing roof on main building; Installation of new roof on main building; Extend main building parapet, clad with metal panel; Install new skylight; Replace damaged interior ceiling tile with new ceiling tile; Supply new door; Supply rooftop safety equipment; Replacement of entire HVAC building control system with the Schneider Electric EcoStruxture.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis