Summary
The owner plans to install an electric charging station for electric aircraft. BETA Technologies will be providing the charging cube, mini charging cube, power tower and panel board. All electrical items will be installed on concrete pads. Work includes Temporary construction items (including temporary AOA fence); Erosion and sediment control devices; Removal of existing pavement and general site clearing; Excavation and Topsoil Stockpiling; Installation of concrete pads; Installation of ductbanks and other electrical items (including connections to items provided by BETA). Restoration of the site. Anticipated Trades: Electrical, Concrete, Site Work, Fencing.