Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of but not limited to Interior Renovations of two units including, but not limited to: kitchen, and bathroom renovations, flooring removal and new installation, including asbestos remediation, and new interior painting throughout.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
Posted Date
Dec 17, 2025
Due Date
Feb 12, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
AvailableWork includes replacement of stoops. See outside link.
Posted Date
Oct 29, 2025
Due Date
Feb 4, 2026
Release: Oct 29, 2025
Close: Feb 4, 2026
Work includes replacement of stoops. See outside link.
AvailableInterior upgrades to create accessible first floor and update existing finishes.
Posted Date
Jan 3, 2026
Due Date
Feb 6, 2026
Release: Jan 3, 2026
Close: Feb 6, 2026
Interior upgrades to create accessible first floor and update existing finishes.
AvailableProject consists of but not limited to: reconstruction of existing driveways, parking areas and hma & concrete walkways, as well as proposed electrical and drainage work.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
Project consists of but not limited to: reconstruction of existing driveways, parking areas and hma & concrete walkways, as well as proposed electrical and drainage work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →