Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Outdoor learning improvements. Outdoor learning pavilion structure, associated sitework, storm water, and electrical work at both schools.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Elementary School HVAC Renovations. Replacement of (5) Rooftop Heat Recovery Units with Dedicated Outside Air System that is an air cooled, DX Rooftop Unit with hot gas reheat, with an energy recovery wheel, and natural gas fired furnace for heating. Re-use existing ductwork. Replace Library RTU with air cooled DX Rooftop unit with hot gas reheat to address humidity, energy recovery wheel as needed per energy code, and natural gas fired furnace for heating. Re-use existing ductwork. All new RTUs to be air cooled DX with hot gas reheat, energy recovery (as needed per code), with natural gas fired furnace for heating.
Posted Date
Oct 3, 2025
Due Date
Dec 17, 2025
Release: Oct 3, 2025
Close: Dec 17, 2025
Premium
Access the largest public sector contact database
Elementary School HVAC Renovations. Replacement of (5) Rooftop Heat Recovery Units with Dedicated Outside Air System that is an air cooled, DX Rooftop Unit with hot gas reheat, with an energy recovery wheel, and natural gas fired furnace for heating. Re-use existing ductwork. Replace Library RTU with air cooled DX Rooftop unit with hot gas reheat to address humidity, energy recovery wheel as needed per energy code, and natural gas fired furnace for heating. Re-use existing ductwork. All new RTUs to be air cooled DX with hot gas reheat, energy recovery (as needed per code), with natural gas fired furnace for heating.
AvailableProvide a turn-key project for installation of new 10,000-gallon septic tank including connection to the existing 4" sewer line.
Posted Date
Nov 25, 2025
Due Date
Dec 19, 2025
Release: Nov 25, 2025
Close: Dec 19, 2025
Provide a turn-key project for installation of new 10,000-gallon septic tank including connection to the existing 4" sewer line.
AvailableBoiler Replacement At Various Elementary Schools
Posted Date
Nov 29, 2025
Due Date
Dec 16, 2025
Release: Nov 29, 2025
Close: Dec 16, 2025
Boiler Replacement At Various Elementary Schools
AvailableProvide flooring replacement at 9 elementary schools.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Provide flooring replacement at 9 elementary schools.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis