Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Phase 1: Work of this Phase includes installation of approx 2,200 LF of 8" arctic high density polyethylene (HDPE) pipe to replace the existing 8" ductile iron pipe (DIP) water main in the Indian Creek Subdivision (ICS), new hydrant assemblies, replacement of twenty-four (24) copper water services with jacketed insulated PEX pipe services with buried curb stops. Services will include electrical heat trace and home electrical connections with new circuit breaker. Phase 2: Work of this Phase includes installation of approx 1,800 LF of 8" arctic HDPE transmission main from the ICS to Lower Village distribution main, installing new pressure pumps, pipe connections, pressure switches and control panel in the water treatment plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailablePlumbing fixture renovation and water- tree system replacement project.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
Close: Jan 8, 2026
Plumbing fixture renovation and water- tree system replacement project.
AvailableThe replacement of approx. 3,250 LF of waterline and associated appurtenances.
Posted Date
Apr 11, 2025
Due Date
Jan 12, 2026
Release: Apr 11, 2025
Close: Jan 12, 2026
The replacement of approx. 3,250 LF of waterline and associated appurtenances.
AvailableAdvanced water meter solution for the city's approx., 22,450 water meters which includes the supply and installation of non-mechanical water meters and radio transmitters as well as an advanced metering infrastructure software and related training services.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Close: Jan 14, 2026
Advanced water meter solution for the city's approx., 22,450 water meters which includes the supply and installation of non-mechanical water meters and radio transmitters as well as an advanced metering infrastructure software and related training services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis