Summary
Contractor shall provide all labor, equipment, and materials required to install a new fence and entrance gate to better secure the tuin maintenance shop and curatorial storage and add openers to the entrance and exit gates. This project shall include the removal and proper disposal of existing fence and gate offsite. The following list are the necessary requirements needed: Remove the existing chain-link fence and remove the off site for disposal. Prep the area for the new fence removing vegetation and debris from the site. The fence to be installed shall be made of rod iron and measure approx. 1,300 F in length. The height should measure 8 F in height with security spikes curved away from the fence to prevent intrusion. The entrance gate shall be an 18 F long sliding gate made with the same rod iron material as the fence gate. Commercial grade fencing is required. Materials can be substituted if specified gauging is not available upon government approval. See attached file.