Summary
Project includes site development and construction of a pre-engineered metal building(s). The base bid includes site development, and an approx 1,725 SF, slab-on-grade, pre-engineered metal building that will serve as a staff building. Alternate bid 1 includes two slab-on-grade, pre-engineered metal building bus garages, each approx 8,700 SF. Alternate bid 1 also includes two steel frame walkway canopies and foundations. Alternate bid 2 includes an approx 3,580 SF, slab-on-grade, pre-engineered metal building that will serve as a maintenance garage. Alternate bid 3 includes 10" gravel surface parking lots and drives in lieu of 8" poured concrete paving.