Summary
Upstairs restroom and breakroom repairs includes, men's restroom and locker room: remove and discard existing entrance door, frame, floor base molding in locker room to rough opening. Relocate twenty-three (23) lockers. Location tbd. Retain two (2) uni-first lockers across form urinal for re-installation. Relocate to secure area two (2) floor-affixed benches for later re-installation. Remove all existing lvt tiles and mastic from subfloor surfaces (approx. 200sf). Remove and discard existing partitions, shower, toilet, urinal, mirror, vanity/sink, dispensers, lighting fixtures, exhaust fan. Remove and discard all existing ceramic tiles and mastic (approx. 300 SF). Remove and discard all existing drop ceiling tiles. Grid shall remain. Clean locker room ceiling registers and surfaces to remove dust and debris (see below general section).