Summary
Work includes 1 MO signs, barricades, and traffic handling; 22 LF concrete curb & gutter (ty ii); 2 EA curb ramp w/landing (ty 7); 25 LF conduit (pvc)(sch 40)(3"); 30 lf conduit (pvc)(sch 40)(3")(bore); 385 LF conduit (prepare); 35 sf aluminum signs (ty a) 1 EA install hwy trf sig (isolated)(relocation of sig equip subsidiary); 2 EA veh sig sec (12")led(grn arw); 4 EA veh sig sec (12")led(yel arw); 2 EA veh sig sec (12")led(red arw); 4 EA ped sig sec (led)(countdown); 6 EA backplate w/reflective boarder (3 section)(aluminum); 4 EA backplate w/reflective boarder (4 section)(aluminum); 40 LF trf sig cbl (tya)(14 awg)(5 condr). See attached file.