Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Well House Renovations and Building Replacements: rehabilitation of the existing chlorine well house, the installation of new chlorine equipment, rehabilitation of existing piping in or around the chlorine well house, demolition of the existing shed structure, construction of a new metal shed structure, construction of a new CMU storage building, and other miscellaneous items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. the painting exterior and interior of a 75,000 water storage tank, replacing FAA lighting, tank float, exterior ladder, exterior balcony and railing. See outside link for more details.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Work includes approx. the painting exterior and interior of a 75,000 water storage tank, replacing FAA lighting, tank float, exterior ladder, exterior balcony and railing. See outside link for more details.
AvailableProject consist of approx 3,900 SY of 1.5" Milling Existing Asphalt Pavement; 10,700 LF of of Solid Yellow Traffic Stripe; 200 CY of excavation; 30 LF of 24" Reinsforce concrete pipe. See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
Project consist of approx 3,900 SY of 1.5" Milling Existing Asphalt Pavement; 10,700 LF of of Solid Yellow Traffic Stripe; 200 CY of excavation; 30 LF of 24" Reinsforce concrete pipe. See outside link.
AvailableInstall approx. 7,200 LF of 8", 6", and 2" PVC/DI pipe water main including, fire hydrants, valves, driveway replacement, earthwork, grassing, soil erosion and sedimentation control measures, and appurtenances necessary to provide a complete installation.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Install approx. 7,200 LF of 8", 6", and 2" PVC/DI pipe water main including, fire hydrants, valves, driveway replacement, earthwork, grassing, soil erosion and sedimentation control measures, and appurtenances necessary to provide a complete installation.
AvailableWater distribution improvements project.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Water distribution improvements project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →