Summary
Project consists of constructing approx. 14,800 LF of 6 and 8" water mains and associated appurtenances along portions of road. Work includes 1 LS erosion control; 200 CY rock removal (contingency - minimum $75.00/CY); 1,560 LF furnish & install 6" dia. zinc coated class 52 dip water main with v-bio polyethylene encasement, complete; 11,640 LF furnish & install 8" dia. zinc coated class 52 dip water main with v-bio polyethylene encasement, complete; 1 LS directional drill with dips 8" dr-11 hdpe water main (carrier pipe) with dips 14" dr-11 hdpe casing pipe at creek crossing #1 at p16+47, complete. See outside link.