Summary
Work includes approx. ; 360 LF of 8" SDR 21 PVC waterline; 106 LF of 6' high chain-link security fence; 516 LF of 6" SDR 21 PVC water line; 370 LF of 2" HDPE dr 12 waterline; 118 LF of boring - casing (10"); 1,320 LF of 0' - 6' open trenching and backfill. 1 LS mobilization; 1 LS erosion and sediment control; 1 LS construction traffic control; 1 LS cmu block building; 1 LS rechloramination and nitrification controls & equipment; 1 LS pressure reducing valve vault "a"; 1 LS magnetic flow meter concrete vault "B"; 1 LS injection quill concrete vault "C"; 1 LS sample tap concrete vault "D"; 1 LS pressure reducing vault "E"; 1 LS abandon exist. Prv vault; 172 CY embedment material (type II); 1 EA fire hydrant assembly (w/ 12" riser if req'd); 118 lf boring - casing (10"); 299 LF 8" SDR 21 PVC waterline (open trench). See attached file.