Summary
Work includes removal: full tear-off of existing roofing down to the plywood/wood deck. Deck repair: inspection of sheathing and replacement of damaged wood (unit price for plywood replacement should be included). Underlayment: installation of astm d1970 compliant ice and water shield at eaves (minimum 2 rows) and valleys. Shingles: installation of class a fire-rated, 30-year (minimum) ar- chitectural asphalt shingles. Ventilation: installation of a continuous ridge vent and replacement of all roof boots/vents. Flashing: installation of new corrosion-resistant drip edges and chimney/wall flashing. Cleanup: daily debris removal and final magnetic sweep of the grounds.