Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Los Angeles Bureau of Engineering issued a Request for Qualification (TOS No. 99) seeking pre-design, design, and design support services for the Ballona Creek Pumping Plant No. 654 Rehabilitation Project. The opportunity is posted with an open date of 2025-10-22 and a close date of 2025-12-16, and the aggregator provides a link to the original posting for full documentation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Los Angeles, Bureau of Engineering, is seeking qualifications for pre-design and design services for the Lighthouse Street Pedestrian Bridge over Ballona Lagoon. The project scope encompasses a Pre-Design Report, geotechnical engineering, bridge inspection, and various analyses including historic resource evaluation. Proposals must include subconsultant registration with RAMP, a Non-Collusion Affidavit, and a Cost Proposal Worksheet, as this project is part of the Pre-Qualified On-Call Bridge/Civil Engineering Consultants List.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
Premium
Access the largest public sector contact database
The City of Los Angeles, Bureau of Engineering, is seeking qualifications for pre-design and design services for the Lighthouse Street Pedestrian Bridge over Ballona Lagoon. The project scope encompasses a Pre-Design Report, geotechnical engineering, bridge inspection, and various analyses including historic resource evaluation. Proposals must include subconsultant registration with RAMP, a Non-Collusion Affidavit, and a Cost Proposal Worksheet, as this project is part of the Pre-Qualified On-Call Bridge/Civil Engineering Consultants List.
Provide 2026 water treatment plant pump rehabilitation project. The project will include but is not limited to the following major categories of work: full standard rehabilitation for transfer pump no. 3 and high service pump no. 3.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Provide 2026 water treatment plant pump rehabilitation project. The project will include but is not limited to the following major categories of work: full standard rehabilitation for transfer pump no. 3 and high service pump no. 3.
AvailableThe City of Los Angeles (Public Works, Engineering Bureau) is soliciting consultant design services to rehabilitate and reconstruct the 2nd Street Tunnel, including environmental review and preparation of 100% plans, specifications, and estimates (PS&E). The work includes project management, stakeholder coordination, environmental documentation, preparation of construction documents, bid/award support, and potential identification of grant funding; the project duration is estimated at about 24 months.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
The City of Los Angeles (Public Works, Engineering Bureau) is soliciting consultant design services to rehabilitate and reconstruct the 2nd Street Tunnel, including environmental review and preparation of 100% plans, specifications, and estimates (PS&E). The work includes project management, stakeholder coordination, environmental documentation, preparation of construction documents, bid/award support, and potential identification of grant funding; the project duration is estimated at about 24 months.
AvailableWork consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis