Summary
Work include 452 LF of retaining wall; 195 LF of vdot cg-2 curb; 65 TN of 1-1/2" vdot no. 10 stone pavement; 28 Tn of vdot sm 9. 5a surface asphalt; 80 TN of 6" vdot 21 b aggregate based for asphalt; 190 TN of 4" vdot 21 b aggregate stone base for the trail; 110 LF of small wooden split rail fence; 339 LF of wooden split rail fence; 450 LF of sidewalk handrail; 600 SY of 4" thick concrete access ramp; 180 SY of 4" thick decorative landscaping stone w/ fabric; 19 SY of concrete sidewalk; 24 LF of vdot cg-9d curb entrance; 13 LF of vdot cg-6 curb & gutter; 26 LF of 24-inch rcp culvert; 18 LF of 15" rcp culvert; 80 Lf of 18" rcp culvert.