Summary
The City of Yuba City is soliciting bids for the Tierra Buena - Water Consolidations Project to provide drinking water improvements to the Tierra Buena Mobile Home Park. The work involves constructing a new 2-inch water pipe connecting the mobile home park's water distribution system to the City's 12-inch water main with a master flow meter, and abandoning the existing groundwater well and two hydropneumatic tanks. The project is funded by the State Water Resources Control Board under the Technical Assistance for Urgent Drinking Water Needs (UDWN) program, with an Engineer's Estimate of approximately $110,000 and a 30 working day project duration.