Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a three-span prefabricated steel bridge. The project also includes construction of 165' of wood boardwalk, 5,035 SF of concrete pavement, and roughly 2,000 CY of embankment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Perform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.
AvailableReplace an existing footbridge at the Miracle Field/Little League Complex with an ADA-compliant bridge to facilitate pedestrian access to the athletic fields. The proposed bridge is a replacement and an upgrade of the existing bridge, which has degraded over time. It would be in the same location. See attached file.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Replace an existing footbridge at the Miracle Field/Little League Complex with an ADA-compliant bridge to facilitate pedestrian access to the athletic fields. The proposed bridge is a replacement and an upgrade of the existing bridge, which has degraded over time. It would be in the same location. See attached file.
AvailableImprovements to the Terminal 25 pedestrian bridge that connects plaza parking garage. This project includes a new elevator, escalator and passenger circulation ramp.
Posted Date
Dec 29, 2024
Due Date
Feb 13, 2026
Release: Dec 29, 2024
Close: Feb 13, 2026
Improvements to the Terminal 25 pedestrian bridge that connects plaza parking garage. This project includes a new elevator, escalator and passenger circulation ramp.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →